MOKA SFX MK-LF04 100W DJ Laser Beam Light Disco Ball Strobe Stage Lighting Moving Head LED Rgb Control Dmx Show Events


Plug: US
Warehouse: China Warehouse
Color: Black
Price:
Sale price€268,95

Description

Description

  • LED chip: 16 3w rgbw LED chips, 4 patterns, and a single green laser. Led life 50000 hours (lens: aspherical lens).
  • Beam angle-1.5 degrees, spot angle minimum 6 degrees, maximum 51.1-30 times/second electronic strobe and random.
  • Color rotation system- rgbw four-in-one rotation, Marko color system.
  • Pan/Tilt: pan-540 degrees/1.5 seconds, tilt: 180 degrees/0.5 seconds.
  • Control Mode- dmx512, RGBW, standalone mode, channel 11/17.

Technical Parameter

Specification:                                        

Item Specifications
Voltage 90-240V / 50-60Hz
Power 100W
LED Chip 16 x 3W RGBW LED chips
Patterns 4 patterns and a single green laser
LED Life 50,000 hours
Lens Aspherical lens
Beam Angle 1.5 degrees
Spot Angle Minimum 6 degrees, maximum 51 degrees
Color Rotation System RGBW four-in-one rotation, Marko color system
Strobe 1-30 times/second electronic strobe and random
Pan/Tilt Pan: 540 degrees / 1.5 seconds, Tilt: 180 degrees / 0.5 seconds
Control Mode DMX512, RDM, standalone mode
Channel 11/17

             

Please Note:

We have different power supply plugs, United Kingdom plugs, AU plugs, EU plugs, the USA plugs, please let us know the power supply you need, or we will choose everything according to your country.

Applicable places: DJs, bands, bars, pubs, clubs, skating rinks, KTV, family parties, birthdays, celebrations, weddings, festivals, shopping malls, stores, stores, and other designated places.

How To Use

The manual will be with the machine, if the manual is missing, please leave a message on the website, and will contact you as soon as possible

Shipping

  • U.S. warehouse: 2-5 working days in the U.S., 7-12 working days in other areas.
  • Spain warehouse: 2-4 working days in Spain, 7-12 working days in other EU regions.
  • Poland warehouse: 2-4 working days in Poland, 7-12 working days in the rest of the EU.
  • China warehouse: 7-20 working days for direct shipment from China.
  • The transportation type depends on the region, and it is uniformly displayed as international shipping. 
  • The goods will be sent out within 1-5 working days. After the logistics order number is generated, customer service will send an email to notify you. Please pay attention to the delivery status.
  • If you have any questions, please leave a message.

You may also like

Recently viewed